In accordance with the hydraulic design specifications contained in the "Manual forĮrosion and Sediment Control in Georgia" specified in O.C.G.A. Used in this subsection, the terms "proper design" and "properly designed" mean designed § 12-5-30(f), the Georgia Water Quality Control Act. Substantially similar terms contained in a permit for the discharge of stormwater Practices shall constitute a complete defense to any action by the director or toĪny other allegation of noncompliance with subsection (b)(2) of this section or any Proper design, installation and maintenance of best management Limits of required stream buffers and setbacks on the property īuffer zone topography with contour lines at no greater than five-foot contour intervals ĭelineation of forested and open areas in the buffer zone and,ĭetailed plans of all proposed land development in the buffer and of all proposedĪ description of all proposed land development within the buffer and setback andĪny other documentation that the Cobb County Community Development Agency may reasonablyĭeem necessary for review of the application and to insure that the buffer zone ordinanceīest management practices as set forth in this article shall be required for all landĭisturbing activities. The location of all streams on the property and 16., below) any permit applications shall be required to include the following With respect to development on properties with stream buffers (refer to subsections 50-75(b)15. (as listed in section 50-74) shall institute minimum soil erosion and sedimentation control measures. Landĭisturbing activities that are exempted from obtaining a permit and preparing a plan Measures shall be installed to prevent or control erosion and sedimentation pollutionĭuring all stages of any land disturbing activity and the NPDES general permit. Of measures and practices shall apply to all features of the site, including streetĪnd utility installations, drainage facilities and other temporary and permanent improvements. Practices shall conform to the minimum requirements of this section. Soil erosion and sedimentation control measures and The provisions shall be incorporated into the erosionĪnd sedimentation control plans. Therefore, plans for those land disturbing activities which are not excluded by thisĪrticle shall contain provisions for application of soil erosion and sedimentationĬontrol measures and practices. Excessive soil erosion and resulting sedimentation can take place during land disturbingĪctivities if requirements of this section and the NPDES general permit are not met.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |